[SOLVED] Collaborative Practices & Project Management
Coursework – Module PDE3710
Collaborative Practices & Project Management
Page 1 of 4
Project 2: Carpenter Estates Office Building: Write a Project Management Plan
for the Design of Carpenter Estates Office Building.
________________________________________________________________________________________________________________________________________________________________________________________________________________________
1. Introduction
This project sets out for students to develop a Project Management Plan (PMP) for the design of the
Carpenter Estates Office Building (Graduation project PDE3730). The project will require students to
develop various programs and documents required as part of a comprehensive PMP for activities
relevant to RIBA Stages 0-4.
You need to write a report about your learning of various aspects of Project Management discussed
during the module. You need to apply the topics we discuss to the design of the Carpenter Estates Office
Building. Your PMP should also include a: work breakdown structure (WBS), Stakeholder Management
Plan, Risk Register and Risk Management Plan, Health & Safety Management Plan, Schedule and
Resource Management. This needs to be based on the RIBA Plan of Work.
Figure 1: Carpenters Road Estate
Coursework – Module PDE3710
Collaborative Practices & Project Management
Module Tutor: Viorel Mihailuc Module
Leader: Dr Homeira Shayesteh
January 2022
Page 2 of 4
2. Task
The main task is to prepare the Project Management Plan assuming you are appointed as ‘Project
Manager’.
As a project manager of the project, produce a REPORT to the client highlighting how the project will
be managed using innovative approaches for its successful completion and include a project plan. Your
response should include but is not limited to, the following aspects of the project management.
• Project Management considerations, framework including the processes and work break down
structure
• Integration of sustainability considerations in the project management, such as waste
management plan
• Stakeholder Management Plan
• Communication plan
• Fee management plan
• Review of management structure, procurement route, and type of Contract
• Construction sequencing and progress monitoring
• Potential risks and their management
• CDM/ fire / health & safety and accessibility management
• Sustainability planning and Management (inc. analysis studies, how affect operations, FM).
• Control of changes in the project
In addition to the above, you need to include how BIM can improve the process of managing your
project based on the EIR and BEP documents that you produced during the first term. Also, you can use
tools such as Navisworks – which you will learn this term – for better delivery of project sequencing and
cost planning.
The project plan should be in the form of a Gantt Chart using planning software such as Gantt Project
(Open source and free). Your report should be a critical appraisal with justification and not a simple
repetition of the factual aspects. It should be clearly organized and presented. It must be fully referenced
using the Harvard system of referencing and all the web sources should be clearly identified. References
should be collated at the end of the report.
2. Aims – The aims of this project are to:
• 2.1. Facilitate students learning through a whole lifecycle project enhancing their team working skills
• 2.2. Develop the ability to navigate between the RIBA Stages.
• 2.3. Evaluate the responses to construction project management strategies.
• 2.4. Develop an understanding of the principles of project management.
• 2.5. Demonstrate understanding of risk management and stakeholder management strategies.
Coursework – Module PDE3710
Collaborative Practices & Project Management
Module Tutor: Viorel Mihailuc Module
Leader: Dr Homeira Shayesteh
January 2022
Page 3 of 4
3. Learning Outcomes:
This assessment will enable students to demonstrate in full or in part the learning outcomes identified in
the module handbook.
You can use this report as part of your portfolio for entering the CIAT Graduation Award.
Term 2 Deliverables:
Individual Analytical Report – 3000 words (40% – due week 25)
Page 4 of 4
MARKING SCHEME
In the assessment of the report, marks will be awarded for the following in the weighing shown. The
discussions about the individual contributions happened during the term.
Criterion Weight (70%-100%) 1 – 4 (60%-69%) 5 – 8 (50%-59%) 9 – 12 (40%-49%) 13 -16 (0-39%) 17 – 19
Knowledge and
understanding of
key principles of
project
management
strategies and
processes
20% Evidence of
significant and
excellent and well
informed
understanding of
topics involved
Evidence of wide
research and
excellent
understanding of
topic.
Main objectives of
the assignment
brief covered to a
competent standard
Limited approach
in answering
assignment
briefed
Little
understanding of
what was
required
Responding to
considerations of
the sustainability
management
plan.
Waste
Management
Plan.
10% Conclusions/judgem
ents consistently
logical when dealing
with incomplete or
contradictory
information or
cutting-edge
ideas/practice, and
frequently showing
insight beyond the
expectations for
this level
Reaches logical
conclusions/
judgements
involving
incomplete or
contradictory
information or
cutting-edge
ideas/practice
Struggles to
develop
conclusions/judge
ments involving
incomplete or
contradictory
information or
cutting-edge
ideas/practice
Topic has not
been handled
well; lack of
understanding of
the concepts.
All aspects of the
section have
been handled
with no
understanding of
the purpose of
task.
Stakeholders and
communications
management
plan.
Control of
Changes in the
project.
20% Excellent
understanding of
stakeholders
requirements and
key issues
underpinning
communications
Very good grasp
of the key issues
and concepts
underpinning the
topic
Mostly good
response justifying
various aspect of
the stakeholders
plan and explains
the thinking behind
it
Struggles to grasp
of the key issues
and concepts
underpinning the
topic
Fails to deal with
incomplete or
contradictory
information
Conclusions/
judgements
inadequate or
absent
Review of
procurement
route and type of
Contract, risk
and change
management
20% Demonstrates
mastery of project
planning in related
areas to advanced
professional
expectations and
exceeds them in
several/many
aspects
Expertise in
project planning
consistently
meets advanced
professional
expectations and
occasionally
exceeds them
Level of expertise
in project planning
generally meets
advanced
professional
expectations
Level of expertise
in project
planning fairly
meets advanced
professional
expectations
Expertise in
project planning
is inadequate,
failing to achieve
expertise or
meet advanced
professional
expectations
Construction
sequencing and
progress
monitoring;
buildability
survey
20% Evidence of
significant and
excellent and well
informed
understanding of
topics involved
Evidence of wide
research and
excellent
understanding of
topic.
Main objectives of
the assignment
brief covered to a
competent standard
Limited approach
in answering
assignment
briefed
Little
understanding of
what was
required
Evidence based
critical analysis
of recommended
solutions, report
structure and
referencing,
word count; and
presentation
10% Excellent report
describing and
justifying various
aspect of the design
and explains the
thinking behind it
Good project
write up with very
clear logical
structure and
good
presentation of
data
The report and/or
drawing and
diagrams are not
fully coherent,
rushed, contains
some errors or
irrelevant material
Write up is poor,
unstructured,
some parts
missing, writing
and drawings
needing
significant
improvement
Major failure in
write up structure
and detailed
drawings with
missing parts,
very poor
readability, not at
all clear